» BCWD UPDATE (9/13/17)                                       » BCWD UPDATE (9/20/17)                                       » Join the 30th Butuan City Water District Local Oratorical Contest                                       » Join BCWD Quarterly Water Quiz Show!                                       » BCWD UPDATE (7/26/2017)                                       

Notice of Award

  1. Package 06-2017 Supply Delivery and Installation of 1 Unit Water Meter Test Bench including Complete Set of Fittings and Accessories
  2. Package 09-2017 Supply & Delivery of Various sizes of Water meter assembly
  3. Package 07-2017 Construction of BCWD Warehouse at Pump Station no. 1 (Labor and Materials)
  4. Package 08-2017 Procurement of Vehicle Rental Services with Tracker (Global Positioning System) for the Year 2017
  5. Package 04-2017 Supply & Delivery of Various uPVC Pipes
  6. Package 03-2017 Supply & Delivery of Various Plastic Fittings
  7. Package 02-2017 Supply & Delivery of Various Brass Fittings
  8. Package 01-2017 Supply & Delivery of Various Galvanized Iron Pipes & Fittings
  9. Package 16-2016 Supply and delivery of various Flow meters
  10. Package 15-2016 Supply and Delivery of 7,000 pcs. Water Meter Assembly ½”Ø, Non-Reversible Reading, Class B, Dry Type, Multi Jet, Anti- Magnetic, ISO 4064
  11. Package 14-2016 Supply & Delivery of 1,469 m3 Sand for Sand Bedding
  12. Package 13-2016 Procurement of 100 length 225mm x 6m uPVC, S-8 w RR, ISO and 67 length 110mm x 6m uPVC, S-10 w RR, ISO
  13. Package 08-2016 Procurement of Various Plastic Fittings - (Re-bidding)
  14. Package 12-2016 Contract Rental of 15 units Vehicle and GPS Year 2016
  15. Package 02-2016 Supply and Delivery One unit Leak Detector with Accessories
  16. Package 01-2016 Supply, Delivery & Installation of customer Management & Monitoring System
  17. Package 15-2015 Procurement of 1 unit Generator Set 150 KVA Re-bidding
  18. Package 10-2016: Procurement of Various Ductile Iron (D.I.) fittings
  19. Package 09-2016 Procurement of Various Cast Iron (C.I.) Fittings
  20. Package 04-2016 Procurement of Unplasticized Polyvinyl Chloride uPVC Pipes
  21. Package 07-2016 Procurement of Various Galvanized Iron (G.I.) Pipes, Steel Pipes & FittingsPackage 07-2016 Procurement of Various Galvanized Iron (G.I.) Pipes, Steel Pipes & FittingsPackage 07-2016 Procurement of Various Galvanized Iron (G.I.) Pipes, Stee
  22. Package 06-2016 Supply and Delivery of various diameters of Water Meter Assembly, Non-Reversible Reading, Class B, Dry Type, Multi Jet, Anti- Magnetic, ISO 4064
  23. Package 05-2016 Procurement of Various Brass Fitting
  24. Package 03-2016 Procurement of Black High DensityPolythylene (HDPE) pipes
  25. Package 19-2015 Supply and Delivery of Various Fittings for New Service Connection
  26. Package 17-2015 Procurement of One unit Brand New Water Tanker Truck
  27. Title: Package 18-2015 Supply and Delivery of 1 unit High Speed Inkjet Full Color Printer
  28. Package 16-2015 Supply and Delivery of 6,660 pcs. Water Meter Assembly 12, Non- Reversible Reading, Class B, Dry Type, Multi Jet, Anti-Magnetic, ISO 4064
  29. Package 14-2015 Construction of the BCWD Administration Building Renovation Labor and Materials
  30. Package 10 – 2015 Supply and Delivery of Black High Density Polyethylene (HDPE) Pipes
  31. Procurement of Three (3) units Utility Service Vehicles with Fabricated Body
  32. Package 11-2015: Supply and Delivery of 800MM and 900MM DIA. Butterfly Valves (Flanged Type)
  33. Package 7- 2015: Supply and Delivery of uPVC Pipes with Rubber Gasket and Warning Tapes
  34. Package 09-2015: Supply & Delivery of Brass Fittings and Hydrant Heads
  35. Package 05-2015: Supply & Delivery of Plastic Fittings
  36. CRYSTALLA GLASS ART GALLERY ENTERPRISES
  37. Title: Package 02-2015 : Procurement of Vehicle Rental Services with Tracker (Global Positioning System) for the year 2015
  38. Procurement of Package 20-2014 : Supply & Delivery of 1 unit Motor Vehicle Van Type - Negotiated Procurement
  39. Package 01-2015 Procurement of Security Services for 2015