News for March 2025

1. BCWD DISCONNECTION SCHEDULE (March 19, 2025)
BCWD ANNOUNCES DISCONNECTION SCHEDULE FOR March 24, 2025....
2. WATER SERVICE INTERRUPTION D a t e : March 19, 2025

Period of Interruption : 10:00 PM (March 19, 2025) - 04:00 AM (March 20, 2025)
Purpose : Emergency replacement of 2-inch ...

3. WATER STATUS UPDATE (March 18, 2024; 3:30PM)

The Butuan City Water District (BCWD) completed the repair of the damaged 4-inch diameter distribution line UPVC pipe in Purok 3, ...

4. EMERGENCY PRESS RELEASE D a t e : March 18, 2025

Period of Interruption : 10:00AM to 03:00PM or until completion of work.
Purpose : Repair of leaking 4-inch diameter UPVC pipeline ...

5. BCWD DISCONNECTION SCHEDULE (March 17, 2025)
BCWD ANNOUNCES DISCONNECTION SCHEDULE FOR March 19-20, 2025...
6. ADVISORY: FLUSHING (March 16 - 31, 2025 | 10:00PM - 4:00AM)

The Butuan City Water District (BCWD) will be conducting flushing activities from 10:00 P.M. to 4:00 A.M at the following areas, ...

7. BCWD DISCONNECTION SCHEDULE (March 14, 2025)
BCWD ANNOUNCES DISCONNECTION SCHEDULE FOR March 17-18, 2025...
8. BCWD ADVISORY | BCWD to Conduct Beta Testing for E-Bill

Butuan City Water District (BCWD) is set to conduct beta testing for its new e-bill from March 15 to 26, 2025, ...

9. BCWD DISCONNECTION SCHEDULE (March 10, 2025)
BCWD ANNOUNCES DISCONNECTION SCHEDULE FOR March 13, 2025....
10. BCWD Joins LWUA in Celebration of World Water Day

The Butuan City Water District joins the Local Water Utilities Administration in celebration of World Water Day on March 22, 2025, ...

11. Notice of Water Service Interuption: FLUSHING Activities

(March 1 - 15, 2025; 10:00PM - 4:00AM)
The Butuan City Water District (BCWD) will be conducting flushing activities from 10:00 ...