WATER STATUS UPDATE RESUMPTION OF WATER SUPPLY (September 30, 2023 as of 05:00 PM)

(September 30, 2023; as of 05:00 PM)
The Butuan City Water District (BCWD) completed the repair of the damaged 4-inch diameter uPVC pipeline near Iglesia ni Cristo at Brgy. Taguibo, Butuan City, as of September 30, 2023 at 5:00 PM.
Build-up of water pressure has already been completed and normal water pressure has been restored in the affected area.
For more info / updates, feel free to contact our Call Center at (085) 817-6635; (085) 817-6736; 0918-930-4234; 0917-188-8726.
Thank you so much for bearing with us.

Total Views: 515   Today: 2
Last Update: October 02, 2023